2012: Transforming the Bridge | 12377
Team: Renee Martin
Location: Cincinnati, Ohio
Overview: ARCADE
THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH LITTLE (SUPPLEMENTAL) MEANS. A FEW NEW MATERIALS INTRODUCE A SPATIAL STRATEGY THAT EXAGGERATES AND CONFOUNDS THE EXISTING QUALITIES OF THE BRIDGE: ITS REPETITIVE STRUCTURE, RELATIONSHIP TO WATER, AND SENSE OF WEIGHT AND WEIGHTLESSNESS. THE INSTALLATIONS ALSO IMPROVE THE COMFORT AND SAFETY OF THE PUBLIC.
TRACK SYSTEM SUPPORTING ELECTRICAL AND THERMAL CURTAINS: INDUSTRIAL CURTAINS OUTFITTED WITH WIRING HANG FROM CEILING-MOUNTED TRACKS, PROVIDING ACCESS FOR LIGHTING, SOUND, AND HEAT IN PERFORMACES ALONG THE BRIDGE. (SHOWN IN BLUE TO RIGHT)
CONTINUOUS SAFETY RAIL: AN AGGREGATED PIPE RAILING TRACES THE OUTLINE OF SPACE OPEN TO THE PUBLIC FROM DAWN TO DUSK. THE RAIL IMPROVES PUBLIC SAFETY, CREATES A VISUAL SIGNAL FOR USE, AND UNDULATES TO MAXIMIZE EXPERENCE. (SHOWN IN GREEN TO RIGHT)
24-HOUR BIKEWAY: THE BIKEWAY IS SEPARATED FROM THE GENERAL PUBLIC SPACE IN ORDER TO CREATE A PERPETUALLY USABLE ROUTE FOR COMMUTERS AND RECREATIONAL CYCLISTS. VOLUNTEER BIKE RANGERS MAINTAIN A CONSTANT PRESENCE ON THE BIKEWAY. (SHOWN IN ORANGE TO RIGHT)
REFLECTIVE MATERIALS ARE USED THROUGHOUT TO MORE EVENLY ILLUMINATE PATHS AND EXAGGERATE VIEWS AND SENSATIONS.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the