2012: Transforming the Bridge | 12376
Team: Alessandro Meli
Location: Chieri, Torino, Italy
Overview: ON the BridGe
The idea of the project started by considering the historical photos you provide and those found on historic sites in the city of Cleveland, were also very useful videos shot in the upper level.
The structure of the bridge has bound very design choices but no changes were made special modifications apart from the creation of openings.
The basic idea was to go put the features on the bridge closing spaces with transparent glass. All actions are reversible.
Priority was given to the bike path that runs along the north side of the bridge, and does not cross the path of pedestrians so as not to create hazards.
One of the strengths of the project was to resurface the old tramlines and consequently the tram cars, entering into them, functions such as restaurant, information point and a car dedicated to the history of the bridge.
We have also added revenue on all four sides by restoring the old openings that faced the surface (both sides of the south bridge).
The addition of some glass lifts allows the achievement of the lower part of the bridge also from the center, so as to be able to use parking below. The interventions were designed not to affect the aesthetics of detroit superior bridge, for you can always enjoy the same fantastic skyline.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the