2012: Transforming the Bridge | 12335
Awarad: Honorable Mention
Team: Wurlitzer Architekten GMBH, Gudrun Wurlitzer
Location: Berlin, Germany
Overview: The design of the Lower Level Detroit-Superior Bridge aims to reconnect and improve pedestrian and bicycle traffic in the City of Cleveland. This connection is enhanced through segregated bicycle and pedestrian paths, multiple entrances, new lifts and staircases, thoughtful landscaping, and a flexibility of space to allow for public events and performances.
New entrance openings in the bridge have been created to allow for more visitors and better connectivity. These entrance areas are the starting points of the journey through the lower level. Adjacent to the entrances are cultural spaces: the East Pool (cinema) and West Catacombs (art gallery). During events and performances, the Concourses are used for vendors. These areas are designed with a garden-like atmosphere, with vines growing along new ceiling grid structures, and over the concrete barriers. Greenhouse lighting is installed for encouraging plant growth and for improved illumination. The Central Span is the main venue for performances. The gaps in the floor have been filled to create a continuous space. To accomodate large crowds, twelve new staircases have been designed to lead visitors to the Upper Level for safety. Two lifts have also been added on either side of this space for improved accessibility.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the