2012: Transforming the Bridge | 12331
Firm: Jonathan Barnes Architecture & Design
Team: Stephanie Hayward, Jonathan Barnes, Jeremy Little, Tracy Perry
Location: Columbus, Ohio
Overview: Industrial Transformation
The introduction of shipping containers as the basic building blocks of this proposal represents a light touch intervention with minimal disturbance or alteration to the bridge structure. Modifications beyond the placement of the units on the bridge are limited to graphic treatments of the structure and surfaces (paint) and the addition of the east and west external entry structures.
The utilization of the ISBU as the single note in this composition achieves several advantages. The containers, a byproduct of the nationÕs trade deficit and the inexpensive production of containers abroad, are cost effective and readily available. The simply yet sturdy construction of the containers is condusive to easy and varied adaptation and retrofit. They units have standard dimensions of 8Õ width, 8Õ-6Ó height and 20Õ, 30Õ or 40Õ lengths and can be easily connected in multiples.
The ease of installation and independent nature of each unit or group of units allows for a sequenced or phased process of realization. In this way the project can start small and grow organically. Each scene, or programmatic installation, can be realized as funding or sponsorhip is made available through government agencies, non-profit arts or education organizations, or private entities or individuals.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the