2012: Transforming the Bridge | 12328
Team: Grant Alford, Christopher Cornecelli
Location: Houston, Texas
Overview: “OPEN PLANk”
OPEN PLANk re-frames, re-contextualizes and re-energizes the latent beauty and remarkable spatial potential of the Detroit-Superior Bridge by inserting a complementary, variegated four-level bar directly into the existing structure. The new addition provides a visual and performative datum – emphatically straight – against which the nuanced geometry (Fig.2) and unique characteristics of the lower-level spaces can be better appreciated. The radical dialogue induced between the new Plank and existing spaces replaces a beautiful but relatively redundant extrusion with a host of new and diverse spatial localities within the site. As a result, the current linear circulation becomes an endless field of potential itineraries and explorations of a familiar but new urban institution.(Fig.1) In cross-section, Open Plank serves as an architectural catalyst and visual foil to the gradual rise and fall of the bridge, while at the same time creating a literal catalog of sectional types waiting to accommodate any event large or small.(Fig.3) The categorical straightness of Open Plank also provides an iconic visual corroboration of the social and spatial connections between the Warehouse District and Ohio City – as urban form viewed from the city and as a literal frame for individuals to experience direct visual connection across the bridge.(Fig.4)
Related projects

2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The

2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of

2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT

2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of

2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH

2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical

2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing

2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by

2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the