2012: Transforming the Bridge | 12326

Firm: Plincke

Team: Adam Ash, Reno Whitehead, Matthew Goddard, Carl Horsdal, Stuart Ross

Location: Manchester, Lancs, United Kingdom

Overview: A fun and fascinating destination that acts as a base for visiting Cleveland that is affordable and environmentally sound. It will be a flexible facility with links to the existing and proposed transport and social infrastructure.

Design Concept – Sustainable Tourism

West Catacombs and East Pool – Entrance Thresholds

These zones will provide shop and welfare facilities for the camping areas on the bridge with a cycle storage/exchange for both visitors and people wanting to camp on the bridge.

West Concourse – Colonization

Informed by the colonization of the natural landscape by new inhabitants, camping and play spaces along the southern edge. Cleveland’s early linear settlement form along the eastern bank of the Cuyahoga River is represented by the pedestrian/cycleway along the northern edge.

Central Span – Decay

Design informed by the city’s historical decline of heavy industries such as oil and steel with nature taking over. The tram cars will be utilized for ‘glamping’ which can be moved to create a flexible event space for the cultural events held by the city.

East Concourse – Renewal

A flexible contemporary space symbolizing the new growth and regeneration of Cleveland. The camping spaces are more permanent in nature using large concrete pipes.

Related projects
2012: Transforming the Bridge | 12383

School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The

Continue reading

2012: Transforming the Bridge | 12382

Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of

Continue reading

2012: Transforming the Bridge | 12379

Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT

Continue reading


2012: Transforming the Bridge | 12378

Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of

Continue reading

2012: Transforming the Bridge | 12377

Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH

Continue reading

2012: Transforming the Bridge | 12376

Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of ​​the project started by considering the historical

Continue reading


2012: Transforming the Bridge | 12375

Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing

Continue reading

2012: Transforming the Bridge | 12374

Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by

Continue reading

2012: Transforming the Bridge | 12373

Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the

Continue reading


2012: Transforming the Bridge | 12367

Team: Darwin Marrero, Edgardo Arroyo Pagan, Darwin Marrero-Carrer Location: Carolina, Puerto Rico Overview: Opening the lower level of the

Continue reading