2012: Transforming the Bridge | 12293
Team: Andrew Fox
Location: Altamonte Springs, Florida
Overview: The Detroit-Superior Bridge is an historic icon of Cleveland’s identity, but a major part of this great asset is under-utilized and a hospitality/ leisure resort center at this location could attract people from all around Lake Erie into the city’s economy. A bridge level observation lounge, a ‘chef’s table/ dining room kitchen’ restaurant, 2 casino gaming areas with their own lounges, 90 luxury hotels suites, and over 30 tenant vendor retail/ cafe shops add to the adjacent performing arts district. Vertical circulation towers provide multiple access points along the length of the bridge to draw more individuals into the space. The bridge’s existing historical architecture is maintained as the focal aesthetic with the addition of waterproofing systems, modern glass enclosure systems, and vertical egress towers for people to safely occupy a space originally designed for street car traffic. The additional vertical towers reflect the existing architecture elements with the addition of modern glass cap tops to house today’s technological communication equipment and gather rain water for a sustainable aspect of the project. The presentation of these drawings reflects the ‘Settlers Landing’ Rapid Transit Station design of hand drawn classic glass etchings by a local Cleveland artist.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the