2012: Transforming the Bridge | 12191
Team: Kyle McMahon
Location: Ames, Iowa
Overview: Six lanes of vehicular traffic and a small pedestrian path on the upper level create potential dangers. The pedestrian traffic needs to be relocated to the lower level. This design accommodates for the continuous flow of pedestrians as well as those who pause to take in the view. It focuses primarily on the users who want to get from point A to point B quickly and safely. Three resting points at strategic view points and three large welcoming park-like open space entries accommodate those who are simply enjoying the space.
These defined resting points feature an elevated view to enhance the users experience by bring them to the edge. It gives them a true sense of how elevated they actually are. Two entries on the east accommodate both bikers and walkers. The north entrance has steps and is primarily for walkers. Bicyclists can access the bridge through sloped grade of the south entrance.
All pedestrians can access the bridge from the west. Planters with grasses, shrubs, and trees are placed throughout the entries. Wrought iron gives the seating and railings an old yet new feel to the bridge. Smooth black asphalt identifies bike traffic while green colored concrete and wooden flooring marks foot traffic.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the