2012: Transforming the Bridge | 12185
Team: Jacob Graves
Location: Ames, Iowa
Overview: The time has come. Perhaps for the first time in history we, the human race, have to consciously decide the fate of our planet. For thousands of years we lived in relative harmony with the systems that nature has perfected and in the last two hundred and fifty years we have pushed every system to the brink of irreversible destruction. Once we stopped living on solar pay checks and living on solar credit, everything changed. Like every debt, the time has come and the collection agent is knocking on the door.
By drastically changing the way we make things we got ourselves into this situation. Fortunately for us, every action has an equal and opposite reaction. Logic would tell us that by once again drastically changing the way we make things along with the reasons that we make them could once again change the history of the future.
This design represents a system wide re-purposing of anything and everything manufactured by man. By starting with the infrastructure that the rest of the system is built around, we will strategically force a paradigm shift in the areas that need it the most. The time has come for us to start manufacturing the future.
Related projects
2012: Transforming the Bridge | 12383
School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The
2012: Transforming the Bridge | 12382
Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of
2012: Transforming the Bridge | 12379
Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT
2012: Transforming the Bridge | 12378
Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of
2012: Transforming the Bridge | 12377
Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH
2012: Transforming the Bridge | 12376
Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of the project started by considering the historical
2012: Transforming the Bridge | 12375
Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing
2012: Transforming the Bridge | 12374
Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by
2012: Transforming the Bridge | 12373
Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the