2012: Transforming the Bridge | 12149

Awarad: Honorable Mention

Team: Crossboundaries Architects, Binke Lenhardt, Hao Dong, Diego Caro Serrano, Anne-Charlotte Wiklander, Cristina Portoles, Filip Galuszka

Location: Beijing, China

Overview: The project is divided into 4 different stages, organized by different levels of priority. Furthermore the first level will fulfil all the basic requirements whereas the further 3 stages will accomodate
for a more developed design.

STAGE A (BASIC REQUIREMENTS)

ACCESS POINTS AND BIKE LINE
This part looks at the creation of a continuous line that connects all 3 levels (top, middle and ground level). It also organizes the traffic between pedestrians and bicycles efficiently. The connections are divided into two different categories; Horizontal and Vertical. The “horizontal” referrers to the bike ramps and the main pedestrian access whereas the “vertical” referrers to the elevator and stair cores, that connect certain points of the bridge along the different levels. To emphasise the continuity, the bike line will be painted blue, keeping the current floor and accommodating it for the new use of the bridge.

STAGE B (GREEN ADDITIONS)

GREEN LAYER (OASIS)
At this stage the green areas from the ground floor will be extended up to the intermediate level to create a warmer environment. The landscape and space along the river will be improved by introducing different treatments of vegetation and wood.

STAGE C (PROGRAM DEVELOPMENT)

INTRODUCING ACTIVITIES
During this stage a program will be applied. These activities can vary and should relate to the City’s demands. To allow for this adjustable program our proposal provides a simple system consisting of boxes mounted to a steel structure that can easily be dismantled. That in turn offers a very flexible and diverse space. The suggested program has been located in relation to the various spacious qualities that the bridge provide :
-Enclosed spaces (east/west pools): technical boxes that can be used for specific activities i.e. recording studios, projections, special storage etc.
-West concourse: openable boxes with both indoor and outdoor space where art/learning workshops could be held.
-East concourse: market and food area with small moveable boxes where stall keepers can store and display their products.
-Central span: this space is kept clear to allow for special events

STAGE D (THE FINAL TOUCH)

INTERACTION WITH THE UPPER STREET
The last stage looks at the connections to the upper (car) level, by the creation of various elements and perforations. This allows for a visual connection between the different levels, but also provides more natural light to the new spaces below.

Related projects
2012: Transforming the Bridge | 12383

School: Iowa State University Department of Landscape Architecture Team: Ying Zhou Location: Ames, Iowa Overview: Alley of Creativity The

Continue reading

2012: Transforming the Bridge | 12382

Firm: Aptum Architecture Team: Julie Larsen, Location: Syracuse, New York Overview: ÒYELLOW DOT ROADÓ proposes to reconfigure the lower deck of

Continue reading

2012: Transforming the Bridge | 12379

Team: Maria Sanchez Gonzalez, Pablo Humanes Lopez, Natalia Reglero Lopez, Sandra Garcia Almarcha Location: Salamancia, Spain Overview: DETROIT

Continue reading


2012: Transforming the Bridge | 12378

Team: Chipara Bogdan Location: Constanta, Romania Overview: A New Territory for Cleveland The current proposal extends the lower level of

Continue reading

2012: Transforming the Bridge | 12377

Team: Renee Martin Location: Cincinnati, Ohio Overview: ARCADE THIS REDESIGN OF THE DETROIT SUPERIOR BRIDGE ATTEMPTS TO CREATE GREAT EFFECT WITH

Continue reading

2012: Transforming the Bridge | 12376

Team: Alessandro Meli Location: Chieri, Torino, Italy Overview: ON the BridGe The idea of ​​the project started by considering the historical

Continue reading


2012: Transforming the Bridge | 12375

Team: Niels Fehlig, Julia Fehlig Location: Hamburg, Germany Overview: „GARDEN OF SENSES“ – Connecting Green Masterplan – the missing

Continue reading

2012: Transforming the Bridge | 12374

Team: Remco De Haan, Rozemarijn Dam Location: Northcote, Victoria, Australia Overview: The CATWALK is.. 1.Connecting points of interests, by

Continue reading

2012: Transforming the Bridge | 12373

Team: Michele Niaki, Jonathan Davis, Andrew Mcveigh Location: Champaign, Illinois Overview: The SKYDECK is a CONCENTRATED INTERVENTION along the

Continue reading


2012: Transforming the Bridge | 12367

Team: Darwin Marrero, Edgardo Arroyo Pagan, Darwin Marrero-Carrer Location: Carolina, Puerto Rico Overview: Opening the lower level of the

Continue reading